Wiring is cheap while the walls are open and costly once they are closed. When to call your integrator, what to share with your architect and the five decisions worth making early.

Decided long before the furniture arrives
Almost every compromise we see in finished homes was decided, without anyone noticing, months before the first sofa arrived. Technology is usually one of the last things a building project thinks about, and one of the first that needs to be in the walls.
The best moment to call an integrator is while the architect is still drawing, and certainly before the electrician's rough-in. A cable costs very little while the walls are open; once the plaster is on, the same cable can cost a week of work and a repaired ceiling.
Wiring is cheap while the walls are open, and costly once they're closed.

Five decisions worth making early
Where the equipment room will be, and how it's cooled. Which windows get motorized shades, so pockets can be built into the ceilings. Where speakers, cameras and access points sit, so they can be recessed. How the lighting will be controlled. And how much spare capacity to leave for the next twenty years.
None of these needs a final product choice, only intent drawn on the plans early enough to shape the building. Send us the drawings and a list of the rooms that matter most; we'll mark up the plans, coordinate with the electrician and join site meetings at the moments that count.